Final structural design of road bridge at 7th perfectural road of Eva – Meligalas
Project Description
Preliminary and final structural design of a two span prestressed concrete bridge, 30m each. The bridge deck is constructed on prestressed concrete beams and elastomeric bearings are used.
Client: PREFECTURE OF PELOPONISSOS
Location: Peloponnisos
Budget: €1.500.000

