Final structural Design of 6 bridges at national road of Trikala-Arta. Section B: Armatoliko – Aheloos Bridge

Project Description

Four bridges with a span of 35m – 55m from prestress concrete. Bearings and the use of pile foundation is used. Furthermore two (110m and 120m) 5-span steel and composite bridges with bearings are designed. Final design.

Client: MINISTRY OF INFRASTRUCTURE TRANSPORT AND NETWORKS OF GREECE
Budget: €40.000.000 

Final structural Design of 6 bridges at national road of Trikala-Arta. Section B: Armatoliko – Aheloos Bridge