Final structural Design of bridge at Erythropotamos river in Northern Greece

Project Description

A 140m 6-span bridge which consists of a reinforced concrete box girder. Piles are used for its foundation. Final design.

Client: PREFECTURE OF EASTERN MACEDONIA-THRACE
Location: North Greece
Budget: €10.000.000 

Final structural Design of bridge at Erythropotamos river in Northern Greece