Final design on Xiriotissa interchange
Project Description
Preliminary and final structural design of 2 undrepasses 15m long. In addition it has been conducted a final structural of retaining walls and pile-walls.
Client: PREFECTURE OF CENTRAL GREECE
Location:
Budget: €5.000.000

