Final structural Design of bridge at road Organi – Ano Virsini, Northern Greece
Project Description
Geotechnical Research – study for the construction of a 3 span bridge of a total length of 60m. The structure consists of a reinforced concrete box girder. Pile foundation is used.
Client: PREFECTURE OF RODOPI – EVROS
Location: North Greece
Budget: €1.500.000

