Final Structural Design of 6 road-bridges at road No9 (Panepistimioupoli – Gratini – Arriana), Northern Greece

Project Description

Six bridges with precast beams of a length of 150m, 150m, 120m and 3 of 70m are designed. Bearings and pile foundation is used. Final design.

Client: PERFECTURE OF RODOPI – EVROS
Location: Evros
Budget: €1.500.000 

Final Structural Design of 6  road-bridges at road No9 (Panepistimioupoli – Gratini – Arriana), Northern Greece