Final structural Design of 80m prestressed bridge and bored pile-wall at road Goura – Sarantapiho – Derveni
Project Description
A 3-span 75m bridge monolithic connected to the piers and via bearings to the abutments. A 300m bored pile wall of a mean height of 6m. Final design.
Client: PREFECTURE OF PELOPONISSOS
Location: Peloponnisos
Budget: €18.000.000

